Building "Under" - Under's concrete shell and windows were assembled on a barge just a stone's throw from the shoreline. From there,
it was carefully lied and moved to the project's site where it floated on its own before being guided by tugboats to its precise location.
Without damaging its structure and the ecology below, Under was placed on its foundation by filling the structure with water to help it
sink. Following its submersion, its was bolted to concrete anchored to the seabed before being drained and therefore, authorizing the
team to design the restaurant's interior.